EV charger layouts for new-build sites
Send us your site plan. We send back charger positions, ducting routes, supply requirements and a cost per plot.

- Average saving
- 9%
- on site infrastructure
- Plots designed
- 60,000+
- across UK developments
Design pack
What’s in your design pack
Everything your contractors need to fit chargers plot by plot.
- Charger positions, plot by plot
- Ducting and cable routes
- Supply and load requirements
- Connectivity, per charger
- Cost per plot
- Part S compliance

Site problems
Site problems we solve at the design stage
Garden boundary needs changing?
We plan access paths and ducting routes around conveyancing and boundary issues at the design stage.Charger outside of Wi-Fi range?
Charger too far from the property’s Wi-Fi? We evaluate the layout and select the best connectivity option for each one.Enough space for footings?
We wall-mount wherever we can, and when that isn’t possible we keep costly street furniture to a minimum.Cable length over 60m?
Our ducting plans map every route from the power supply to each charger to industry standard, so contractors can start straight away.
How it works
What happens after you send a site plan
Send your site plan
A DWG or PDF is all we need. No site visit.
We design the site
Positions, mounting and Wi-Fi or 4G for every plot.
Get your design pack
Ducting, load and cost per plot, ready for tender.
Chargers arrive ready
Pre-commissioned before they leave us.
Contractors install
Fitted to the plan, plot by plot.
Live at handover
Each home goes live in MyBrim, with 24/7 support.
Case studies
Recent Brim developments
Case studies
Future-proofing new builds: 67 EV chargers installed at Weston Homes’ Sydenham
Brim fitted Dylon Riverside with 67 smart EV chargers: one per residential parking bay, on the landlord supply, with residents billed only for the energy they use.
Case studies
Helping Fernham Homes power up with Brim’s billing for shared chargers
Fernham Homes installs 27 EV chargers at its head office with Brim’s billing for shared chargers: staff pre-pay in the MyBrim app, and the company earns commission on every session.
Case studies
Electrifying Weston Homes, Stansted
126 EV chargers at Weston Homes’ head office car park on the existing supply: Brim’s Intelligent Power Management ran them on 375 amps instead of 4,000+.
Design service
Send us your site plan
We reply with a full layout and a cost per plot.


